Bio Medical Waste monthly register for the month of July 2024 for Salem Works. |
Download |
Bio Medical Waste monthly register for the month of June 2024 for Salem Works. |
Download |
Six-monthly EC monitoring report (October 2023 to March 2024) for ARCL |
Download |
Six monthly compliance reports of CRZ Clearance for Installation of Discharge of Treated Effluent System at JSW Steel Ltd into Amba Estuary at Dolvi |
Download |
Six-monthly EC compliance report (October 2023 to March 2024) for Pellet Plant of capacity 4.0 MTPA at ARCL |
Download |
Six-monthly EC compliance report -3.5 MTPA Coke oven plant and By-product plant from DPCL To JSWSL |
Download |
Six-monthly EC compliance report (October 2023 to March 2024) for 1.0 MTPT Coke Oven Plant of ARCL |
Download |
Six monthly compliance reports (October 2023 to March 2024) - JSW Steel |
Download |
EC-Compliance-Report-EC-2015-May-2024-2 |
Download |
Ec-Compliance-Report-Ec-2020-Jsw-May-2024-1 |
Download |
Environmental Clearance for 3 MTPA steel plant |
Download |
Environmental Clearance for expansion of integrated steel plant from 3 to 5 MTPA |
Download |
Bio Medical Waste monthly register for the month of May 2024 for Salem Works. |
Download |
Bio Medical Waste monthly register for the month of April 2024 for Salem Works. |
Download |
Six-monthly EC compliance report (October 2023 to March 2024) for the Salem Works of M/s JSW Steel Ltd. |
Download |
Six-monthly EC compliance report (October 2023 to March 2024) for the Gonua Iron Ore Mine of M/s JSW Steel Ltd. |
Download |
Six-monthly EC compliance report (October 2023 to March 2024) for the Jajang Iron Ore Mine of M/s JSW Steel Ltd. |
Download |
Six-monthly EC compliance report (October 2023 to March 2024) for the Nuagaon Iron Ore Mine of M/s JSW Steel Ltd. |
Download |
Six-monthly EC compliance report (October 2023 to March 2024) for the Narayanposhi Iron & Manganese Ore Mine of M/s JSW Steel Ltd. |
Download |
Six monthly compliance reports of CRZ Clearance for Installation of Discharge of Treated Effluent System at JSW Steel Ltd into Amba Estuary at Dolvi |
Download |
JSW Steel Ltd., Salem works - CPP II, Fly Ash Stock details as on 31.04.2024 |
Download |
Six Monthly EC Compliance report (April 2023 to September 2023) for JSW Dolvi Works |
Download |
Bio Medical Waste monthly register for the month of March 2024 for Salem Works. |
Download |
JSW Steel Ltd., Bio Medical Waste - Annual Returns - Form IV - Reg |
Download |
Bio Medical Waste monthly register for the month of February 2024 for Salem Works. |
Download |
JSW Steel Ltd., Salem works - CPP II, Fly Ash Stock details as on 29.02.2023 |
Download |
EC Re-validation document for Captive Jetty, JSW Paradip |
Download |
JSW Steel Vijayanagar Works - Quality, Environment, OHS and Energy Policies |
Download |
Bio Medical Waste monthly register for the month of January 2024 for Salem Works. |
Download |
JSW Steel Ltd., Salem works - CPP II, Fly Ash Stock details as on 31.01.2024 |
Download |
EC Re-validation of Integrated Steel Plant |
Download |
Bio Medical Waste monthly register for the month of December 2023 for Salem Works |
Download |
JSW Steel Ltd., Salem works - CPP II, Fly Ash Stock details as on 31.12.2023 |
Download |
Six monthly EC Compliance reports (April 2023 to September 2023) for JSW Steel limited Naharpali, Raigarh |
Download |
JSW Steel Ltd., Salem works - EC - Half year compliance status report for the period of April 2023 to September 2023 |
Download |
Bio Medical Waste monthly register for the month of November 2023 for Salem Works |
Download |
Bio Medical Waste monthly register for the month of October 2023 for Salem Works |
Download |
JSW Steel Vijayanagar Works EC Compliance Report - April-2023 to September-2023 |
Download |
EC Compliance report - Oct, 2022 to March 2023 |
Download |
Bio Medical Waste monthly register for the month of September 2023 for Salem Works |
Download |
Environmental Audit Report - Form No. 5 - 2022-2023 |
Download |
JSW Steel Salem works - Steel Plant Environment Statement Report FY23 |
Download |
JSW Steel Salem works - CPPII Environment Statement Report FY23 |
Download |
JSW Steel Ltd, CPP II, Salem Works Fly Ash Stock details up to the month September 2023 for the FY 2023-24 |
Download |
Bio Medical Waste monthly register for the month of August 2023 for Salem Works |
Download |
Bio Medical Waste monthly register for the month of July 2023 for Salem Works |
Download |
JSW Steel Ltd, CPP II, Salem Works Fly Ash Stock details up to the month July 2023 for the FY 2023-24 |
Download |
JSW Steel Ltd., Salem works - EC - Half year compliance status report for the period of October 2022 - March 2023 |
Download |
EC Compliance NuagaonMines OCT 22 - MARCH 23 |
Download |
Final Half yearly Ec Compliance Gonua Oct 2022- March 2023 |
Download |
Half Yearly EC Compliance Jajang Oct 22 - March 23 |
Download |
Half Yearly EC Compliance Narayanposhi Mines Oct 22-March 23 |
Download |
Bio Medical Waste monthly register for the month of June 2023 for Salem Works |
Download |
Bio Medical Waste monthly register for the month of May 2023 for Salem Works |
Download |
Bio Medical Waste monthly register for the month of April 2023 for Salem Works |
Download |
JSW Salem CPP II Fly ash stock details as on 30.04.2023 |
Download |
JSW Gonua Mine Environment Statement for FY 2021-22 |
Download |
JSW Jajang Mine Environment Statement for FY 2021-22 |
Download |
JSW Narayanposhi Mine Environment Statement for FY 2021-22 |
Download |
JSW Nuagaon Mine Environment Statement for FY 2021-22 |
Download |
EC for 1.2 MTPA from SEIA for Gonua Mines |
Download |
EC for 16 MTPA 2015 for Rungta Mines |
Download |
EC for 7.99 MTPA from Nuagaon |
Download |
Jajang EC transfer acknowledgement |
Download |
Gonua EC transfer acknowledgement |
Download |
Narayanposhi EC transfer acknowledgement |
Download |
Narayanposhi EC |
Download |
Six monthly EC Compliance reports ( April 2022 to September 2022 ) for Gonua Mines |
Download |
Six monthly EC Compliance reports ( April 2022 to September 2022 ) for Narayanposhi Mines, Odisha |
Download |
Six monthly EC Compliance reports ( April 2022 to September 2022 ) for Nuagaon Mines, Odisha |
Download |
Six monthly EC Compliance reports ( April 2022 to September 2022 ) for Jajang Mines, Odisha |
Download |
CRZ clearance for Installation of Discharge of Treated Effluent system from integrated Steel plant JSW Steel Ltd. |
Download |
JSW Steel Ltd., Salem Works - CPP II, Fly Ash stock as on 31.03.2023 |
Download |
Bio Medical Waste monthly register for the month of March 2023 at Salem Works |
Download |
Bio Medical Waste monthly register for the month of February 2023 at Salem Works |
Download |
Bio Medical Waste monthly register for the month of January 2023 at Salem Works |
Download |
JSW Steel Ltd., Salem Works - CPP II, Fly Ash stock as on 31.12.2022 |
Download |
JSW Steel Ltd., Salem works - EC - Half year compliance status report for the period of April 2022 - September 2022 |
Download |
Six monthly Environment Monitoring reports from April 2022 to October 2022 for Amba River Coke Ltd, Dolvi |
Download |
Six monthly EC Compliance reports ( April 2022 to October 2022 ) for Coke Oven Plant (1 MTPA) at Amba River Coke Ltd., Dolvi |
Download |
Six monthly EC Compliance reports ( April 2022 to October 2022 ) for Pellet Plant (4 MTPA) at Amba River Coke Ltd., Dolvi |
Download |
Six monthly EC Compliance reports (April 2022 to October 2022) for JSW Steel Ltd., Dolvi |
Download |
Six monthly EC Compliance reports (April 2022 to October 2022) for Coke Oven Plant (3.5 MTPA) at JSW Steel Ltd., Dolvi (Formerly known as Dolvi Coke Projects Ltd.) |
Download |
Six Monthly Environment Monitoring report from April 2022 to October 2022 for JSW Steel Ltd., Dolvi |
Download |
JSW Steel Salem Works - Bio Medical Waste - Monthly Register - Oct 2022 |
Download |
Environment Statement for JSW Vijayanagar - FY 2022 |
Download |
JSW Salem works- Bio Medical Waste Sept 2022 |
Download |
JSW Salem works- CPP II - fly ash stock as on 30.09.2022 |
Download |
JSW Salem works- Environmental Annual Statement of Steel plant - 31.03.2022 |
Download |
JSW Salem works- Environmental Annual Statement -CPP II - 31.03.2022 |
Download |
JSW Salem works- Bio Medical Waste monthly register - July 2022 |
Download |
JSW Steel Ltd., Salem works - Bio Medical Waste - Monthly Register -Till Oct 2021 |
Download |
JSW Salem works- CPP II - fly ash stock as on 31.07.2022 |
Download |
Narayanposhi Mines Submitted Star Rating Template_2021-22 |
Download |
Nuagaon Mines Submitted Star Rating Template-2021-22 |
Download |
Jajang Mines Submitted Star Rating Template-2021-22 |
Download |
Gonua Mines Submitted Star Rating Template - 2021-22 |
Download |
JSW Steel,Salem works EC Six monthly compliance report October 21 to March 22 |
Download |
JSW Steel E- Waste Annual returns |
Download |
JSW Steel Hazardous Waste Annual Returns |
Download |
JSW CPP#2 E- Waste Annual returns |
Download |
JSW CPP#2 Hazardous Waste Annual Returns |
Download |
Six monthly EC compliance Report 3.5 MTPA coke oven plant |
Download |
Six monthly EC compliance Report ARCL 1.0 MTPA coke oven plant |
Download |
Six monthly EC compliance Report ARCL 4.0 MTPA Pellet Plant |
Download |
Six monthly EC compliance Report JSW Oct 2021 to Mar 2022 |
Download |
Six monthly Environmental Monitoring report ARCL Oct 2021 to Mar 2022 |
Download |
Six monthly Environmental Monitoring report JSW Oct 2021 to Mar 2022 |
Download |
Bio Medical Waste - Annual return FY22 |
Download |
JSW Steel Salem works - Fly ash stock at site as on 30.04.22 |
Download |
Environment Clearance to JSW Utkal Steel Ltd. (JUSL) |
Download |
EC Half yearly compliance report July21 to Sep21 |
Download |
ECL AUTH 9I5009 IA KA IND 229388 2018 |
Download |
ARCL 6 monthly Env Monitoring report COP-PP1 Nov 2021-Comp |
Download |
Coke Oven Plant - ARCL |
Download |
Pellet Plant - ARCL |
Download |
EC Compliance 3.5 MTPA Coke Oven Plant |
Download |
EC Compliance JSW Steel - November 2021 |
Download |
JSW Steel 6 monthly Env Monitoring Report |
Download |
Environmental statement form no. V - 55 MW CPP 31112 16.08.2021 |
Download |
Environment statement form no. V - Sinter 50 19.08.2021 |
Download |
Environment statement form no. V - RMC Batching plant 34069 14.08.2021 |
Download |
Environment statement form no. V - LCP 3 34157 2020-21 18.08.2021 |
Download |
Environment Statement form no. V - HSM & LCP 09.09.2021 |
Download |
Environment statement form no. V - Billet caster & Bar Mill 20.08.2021 |
Download |
Environment statement form no. V - BF 1 03.09.2021 |
Download |
Environment statement form no. V - Coke Oven 2 34255 21.08.2021 |
Download |
Environment statement form no. V - ARCL Pellet plant 12 34093 16.08.2021 |
Download |
Environment statement form no. V - LCP 4 2020-21 18.08.2021 |
Download |
Environment statement form no. V - SIP 2020-21 30.08.2021 |
Download |
JSW Jajang Mine EC Compliance Report Dec 2021 with annexures. |
Download |
JSW Nuagaon Mine EC Compliance Report Dec 2021 with annexures |
Download |
JSW Narayanposhi Mine EC Compliance Report Dec 2021 with annexures |
Download |
JSW Gonua Mine EC Compliance Report Dec 2021 with annexures |
Download |
JSW Nuagaon Mine Environment Clearance dated 05.08.2021 |
Download |
Environmental clearance for Coke oven Plant -II |
Download |
JSW Steel Ltd. Salem works - Bio Medical Waste - Monthly Register -Till Oct 2021 |
Download |
Annual report of the Bio Medical Waste to FY2021 |
Download |
JSW Steel Salem Works HYR for Jan 21 to June 2021 |
Download |
JSW Steel Ltd, CPP II, Salem works Fly ash stock details up to the month August 2021 |
Download |
JSW Steel Salem works CPPII Fly ash stock details till July 2021 |
Download |
JSW Steel Ltd Salem works EC Half year complaince report for the period July 20 Dec 20 |
Download |
JSW Salem Works Fly Ash Stock Details as on 31.06.2021 |
Download |
JSW Salem Works Fly Ash Stock Details as on 31.05.2021 |
Download |
Six monthly Monitoring Report ARCL march 2021 |
Download |
Six monthly EC Compliance Report ARCL march 2021 |
Download |
Six monthly EC Compliance report ARCL Pellet Plan march 2021 |
Download |
Six monthly monitoring report JSW march 2021 |
Download |
Six monthly EC compliance report DCPL JSW march 2021 |
Download |
Six monthly EC compliance report JSW march 2021 |
Download |
JSW Steel Salem works CPP II Fly ash stock as on 31-04-2021 |
Download |
JSW Steel Salem works CPP II Fly ash stock as on 31-03-2021 |
Download |
JSW Steel Ltd, CPP II, Salem works Fly ash stock details up to the month January 2021 |
Download |
JSW Steel Ltd, CPP II, Salem works Fly ash stock details up to the month December 2020 |
Download |
JSW EV 001 Environmental Policy |
Download |
Six monthaly EC Compliance report ARCL October 2020 |
Download |
Six Monthly Environmental monitoring Report ARCL October 2020 Report |
Download |
Six monthaly Ec Compliance report Coke oven II JSW Steel DCPL October 2020 |
Download |
Six monthaly Ec Compliance report Jsw steel October_2020 |
Download |
Six Monthly Environmental monitoring JSW Report October 2020 |
Download |
JSW Salem works - CPP II - fly ash stock |
Download |
JSW Steel., Salem works - Uploading CSR long plan and status report till 30.06.2020 |
Download |
JSWSL - Half Yearly Compliance Report for the period of Jan'20 to Jun'20 |
Download |
JSW Salem CPP II fly ash stock details as on 30.09.2020 |
Download |
JSW Steel CPPII salem works, fly ash stock as on 31.07.2020 |
Download |
JSW Salem - Bio Medical Waste Annual Report 2020 |
Download |
JSW Salem Form V CPP - II 19-20 |
Download |
Captive Power Plant- II. |
Download |
EC for Pellet Plant II |
Download |
ARCL Six monthly Env Monit report October 2019 to march 2020 |
Download |
Six Month Env Monit report JSW Oct 19 to March 2020 |
Download |
ARCL Pellet Six monthly EC compliance report October 2019 to march 2020 |
Download |
EC Compliance ARCL COP I October 2019 to March 2020 |
Download |
EC Compliance Coke Oven II JSW october 2019 to march 2020 |
Download |
EC Compliance JSW Steel 3 MTPA 5 MTPA 10 MTPA October 2019 to March 2020 |
Download |
Salem works Environmental Clearance dated 10.02.2020 |
Download |
JSW Steel Ltd Salem works CPP II Fly Ash stock as on 31-03-2020 |
Download |
Salem works Environmental Clearance compliance status for the period July 2019 to December 2019 |
Download |
JSW Steel Ltd, CPP II, salem works Fly ash stock details up to the month Feb. 2020 for FY 2019-20 |
Download |
JSW Steel Ltd, CPP II, salem works Fly ash stock details up to the month November 2019 for FY 2019-20 (November 2019 closing stock) |
Download |
Nandi Environmental Clearance |
Download |
Nandi Complete CFO complete with extension |
Download |
Nandi Forest Clearance (FC) Final |
Download |
Nandi FC GOK Order |
Download |
Nandi CEC approval to R & R |
Download |
Nandi IBM approval of Mining Plan approval |
Download |
Nandi DMS 106 2(b) permission HEMM |
Download |
Nandi Successful Bidder |
Download |
Nandi Grant of Mining Lease |
Download |
Nandi MDPA |
Download |
JSW Steel Ltd Salem works Environmental Clearance compliance status for the period January-19 to June-19 |
Download |
JSW Steel Ltd, CPP II salem works Fly ash stock details up to the month June 2019 for FY 2019-20 |
Download |
JSW Steel Ltd, salem works Environmental Clearance compliance status for the period July 18 - Dec 18 |
Download |
JSW Steel Ltd, CPP II salem works Fly ash stock details up to the month March 2019 for FY 2018-19 |
Download |
Six Monthly compliance report of EC conditions for Dolvi Coke Project Ltd., Dolvi, Tehsil Pen, District Raigad, Maharashtra |
Download |
CSR Plan For Five year 2019-2024 JSW Steel plant Ltd. Dolvi Works, Tehsil Pen, District Raigad, Maharashtra. |
Download |
Compliance of EC conditions report |
Download |
JSW Steel Ltd., Salem Works - CPP II - Fly Ash stock details FY 2018-19 Till October 2018 |
Download |
JSW Steel Ltd., Salem Works - CPP II - Fly Ash stock details FY 2018-19 Till September 2018 |
Download |
JSW Steel Ltd., Salem Works Half Yearly Compliance Report |
Download |
JSW Steel Ltd., Salem Works - CPP II - Fly Ash stock details FY 2018-19 Till August 2018 |
Download |
JSW Steel Ltd., Salem Works - CPP II - Fly Ash stock details FY 2018-19 Till July 2018 |
Download |
Six Monthly Env Monitoring report from Oct 2017 to Mar 2018 for plants under Amba River Coke Ltd. |
Download |
JSW Steel Ltd., Salem Works- CPP II - Fly Ash stock details FY 2018-19 Till June 2018 |
Download |
JSW Steel Ltd, CPP II, Salem Works Fly Ash Stock Details up to May 2018 for FY 2018-19 (May 2018 closing stock) |
Download |
JSW Steel Ltd, CPP II, Salem Works Fly Ash Stock Details for April 2018 for FY 2018-19 (April 2018 closing stock) |
Download |
JSW Steel Ltd, CPP II, Salem Works Fly Ash Stock details up to March 2018 |
Download |
Environmental Clearance compliance status report : 28.02.2018 |
Download |
JSW Steel Ltd, CPP II, salem works February 2018 |
Download |
10 MTPA Slag and Clinker Grinding Unit of JSW Cement Plant |
Download |
Coke Oven Plant II (3.5 MTPA) of Dolvi Coke Projects Ltd (DCPL) |
Download |
JSW Steel Ltd., Salem Works - CPP II, Fly Ash stock details for January 2018 |
Download |
JSW Steel Ltd., Salem Works- CPP II - Fly Ash stock details FY 2017-18 |
Download |
JSW Steel Salem works EC 1.0 to 1.30 MTPA dated 07.07.2017 |
Download |
JSW Steel Ltd, CPP II, salem works Fly ash stock details up to the month May 2019 for FY 2019-20 (May 2019 closing stock) |
Download |